Marking the installation site #
We’ve included an install template to help with mounting the unit.
Carefully cut out the template from the packaging box.
Please ensure a snug fit when mounting the charger on to the screw heads.
Wall Mounting Instructions
- Position the EV charge point between 0.5 and 1.5m above ground.
- Use a 6mm diameter drill bit to drill the marked three holes (35mm depth).
- Insert wall plugs and drive the supplied screws in the top two holes leaving a 5mm
gap from the screw head and wall (do not overtighten). - Open the charger’s front cover, and hang the back of the housing on the screws.
- Secure the centre locking screw and apply the rubber sealing cap.
- Install the power input cables + CT wiring as required.
Before you proceed #
HELP FROM THE SUPPORT HUB
Turn off the power before beginning installation.
Please follow all instructions carefully.
Download the full User Manual and watch the installation videos available at the Support Hub:
humaxcharging.com/supporthub